Skip to content
← All modules

Praxis

πρᾶξις · Greek — doing

The operational routine, made checkable: design a procedure, schedule it, collect photo evidence on the floor, and have a manager sign it off. It works with no signal and syncs when there is.

Book a demo
€5per month

What it includes

Procedures and runs

  • A checklist designer with typed steps
  • Scheduled runs with a due window
  • Photo evidence attached to the step it proves
  • Manager sign-off, and a record of who signed

Offline first

  • A stock room with no signal is the case this exists for
  • Completed work is queued locally and replayed
  • A refused answer becomes a conflict a person resolves — never silently dropped

Assets and compliance

  • A register of non-stock operational assets
  • Compliance roll-up across premises
  • A metrics report on what keeps failing

Procedures and runs

A checklist that leaves evidence behind.

An opening routine, a closing count, a weekly clean, a safety walk. You write the procedure once; each time it is performed it becomes a run somebody walks through on a phone — and what they recorded stays, whether or not anyone asks.

What a step can ask for

  1. A check

    The plain one: done, or not done.

  2. A choice

    One of the options you listed, so “how did it look?” has comparable answers.

  3. A number

    A temperature, a reading, a count — recorded rather than remembered.

  4. A note

    What they saw, in their own words, when a tick box would lose it.

  5. A photo

    Proof of the state of something. Any step can carry photos, not just this one.

  6. Named figures

    Cash counted, taken on card, new customers — the numbers the day is judged on, collected where they happen.

  7. An asset check

    The state of a specific piece of equipment, with its own history behind it.

  8. A stock count

    What is actually on the shelf, from the person standing in front of it.

It works with no signal

A cellar, a warehouse, a van. The run is walked offline and syncs when there is a connection — including the photos, which is the part that usually is not offline.

Late is not the same as missed

A schedule carries a grace window you set: a closing routine finished at 22:40 is not a failure. What genuinely never happened is marked missed rather than quietly disappearing.

Editing a procedure never rewrites past work

The steps are copied onto each run. Improving the checklist tomorrow cannot change what last Tuesday’s run says happened.

Somebody signs it off

A completed run can be reviewed and signed off by a manager, and it cannot be signed off before it is finished. The result is a document you can hand to an inspector.

A mop is not a fixed asset

Operational kit lives in its own register with its own history. Nothing here posts to the ledger or moves stock — because a mop having a GL account is how an operations tool becomes an accounting problem.

Who watches it

Shift Lead

The routines: was the checklist walked, signed off, and what keeps failing.

One of the eleven AI employees is assigned to this domain. It reads what a person in that role could read, and files what it finds.

How the crew works →